Wednesday 4 July 2012

We've moved in...

Yes, we have :)

It's been crazy busy moving, living and trying to find our way around the house.

It is literally very huge. Huge for two people.

Chris and I are struggling and making a real effort to turn off the lights. They are so far away from each other - so much area space!- Wish we got more double/triple light switches~!!

Some of our stuff is still in boxes and bags ready to be unloaded. Figured if we are going to be living in here long time, we've got forever time to do all that...

More update soon when I get more time. Need to get reading on wedding stuff now! :P

Monday 11 June 2012

Electrical plans

I thought I'd share how marvelous our electrical plans have turned out.

All we could see was dust after 3 days of floor installation. This crazy dust was everywhere in every corner, every inch of our floors, bench-tops, shelves, handrails - everywhere!


So, we got on our cleaning gear, equipped with mops, vacuum cleaners, and stakes of clothes and started cleaning away. And boy; I was in awe every time I needed to plug the vacuum cleaner - cos there was a power point like every two meters. It was heaven! hahhahahha


There is so much room in the house that the vacuum cord kept getting maxed out and had to plug it to the next available socket. Oh-my-golly-gosh! :)


So when we purchased the house, we went with the Delux electrical pack.We then added the following for additional costs:


  • Added 14 extra powerpoints around the house!!!!!
  • An extra flood light (and relocated another one)
  • extra fluro lights in the garage (cos of the 3rd garage)
  • (went with the standard light in the pantry) We were going to go with an automatic light switch but it wasnt necessary. 
  • Added metallic plate to power point switches in the kitchen
  • Had the external junction box fitted outside the brick walls next to the ensuite bathroom
  • Had 3 external waterproof powerpoints (for those BBQ days and lawn mower moments)
  • Added a 20 amp switch in the garage (for husband who likes to use his electrical equipment)
  • Added a gas point in the alfresco area for the BBQ (instead of buying those gas bottles)








The floors - complete

The carpet looks amazing.

And Chris is constantly repeating, "Now, who chose the chocolate colour?? I did!!!!"

Damn, the colours look good!!

Study Room

Theater Room


Master Bed


Entrance




Wednesday 6 June 2012

The floors - progress day 1

 It's been very busy at our place. Our working bee was hard at it today; installing the whole house in just one day. Day 2 tomorrow he will be doing all the skirtings.

The house is now very dusty too and it's a bit of a playground cos you can skid across the room with all this saw dust!




(the pictures dont do the colour any justice)




Tuesday 5 June 2012

Floors are being installed tomorrow

Things are taking shape now. Floors are being installed on Wednesday and Friday this week.

Gas meter should be installed this week too.

On Thursday next week, I'll be watching them install all the appliances. Whooooo hoo!!



residence

Check out the huge family living in this place. 

Nah - actually, they are all the many photo frames Ive collected over the past 12 months! 

The family in the frames are good lookin' too!


Key Night

There was a mini party at our place. Bring on Maccas any day :)



Sunday 3 June 2012

Baking just got real


With this awesome kitchen aid from my AWESOME brother!!!

Entrance

The Pro Tilers were in on the weekend to do our 8sqm entrance with #49 grout  in this grey shade.

Looks awesome and tiles are contrasted very well with the grout colour.

Will post another pic once it's fully dry.



Saturday 2 June 2012

send me a post card please

send me a post card please

because I got a new mail box!


Isnt it the most beautiful letter box out there??

Wednesday 30 May 2012

Living Room ideas




Curtains- BAM!

Curtains have made it to my priority list.

I thought it wouldnt hurt a little just to "browse" cos of course it wouldnt hurt the budget that way. Thought I'd share my little inspiration with you all.

I've got the pro's coming in to provide quotes. I will definitely be having those nice plantation shutters in the bathroom cos they are so hard to cater for! *soccer fist punch*

The other rooms...well to my heart (and treasurer's) desire.


Colour Schemes

BLUE - CREAM - WHITE - maybe GREEN

Loving themes at the moment. I guess depending on what furniture we get  will depend on the curtain fabric as well.

Which one do you like more...please help me decide!!!

1. They are vintage blue peakcock style


2. Blue and white. Simple and elegant combining both plain and pattern textures.



3. Ultra modern and classic. 

Below one is for theatre - needs to make the room dark for movie sessions.


Maybe for living area or to cover up the bi-fold doors??



MOVE IN day sooon!!

Tuesday 29 May 2012

My tips to followers also building the lexington...

Hi Folks,

Our build is now complete. Our keys are in our hot little hands. *hehehe*

I thought I'd provide some quick tips re our build as no doubt some of you may encounter these same dilemmas. 

In comparison 
Before our handover was complete, Chris and I took a trip back to the display houses that inspired us. In fine detail with our "tradies hats on", we went through the house specifically looking at the craftsmanship of the house and the overall finish. What we found was that both Chris and I were very meticulous throughout our journey. The standard of our house is very high because we knit-picked every little detail. Basically we wanted a perfect new house. Nothing more, and nothing less. Is that hard to ask for given your investing big bucks with this builder?

I mean, in comparison to the display house and our completed house, we saw a lot of fine details  that could have easily been touched up or fixed - but- this was a display house and the lovely furniture takes away from the minor imperfections you can see. For example, little paint marks/scratches on walls, shoe marks/prints in odd places, doors had scratches, cupboards with minor dints and scratches. Yes, this was a display house and had a lot of traffic, but this could have easily been fixed (to our standards).

From this comparison exercise, there was lot we took away. Specifically what we should look out for as the house ages. For example the floor joints and trimmings of the back and front entrance- they were very run down - must make sure guest take off their shoes. There was a lot of paint chips on the external walls. Make you they are stained and coated properly.

So in summary, here's my two penny's worth of advice for you all:

1. Beneficial to get an independent inspector at 1) the completion of slab, 2) at the completion of frame and 3) at presentation stage. This was approx. $500 per stage.

If the report comes back with little  results - then you can rest easy knowing you have good tradies on the job. The most value I got was at all stages, but most specifically at Presentation Stage. Our guy was "on our side" to speak in terms of getting what we want fixed prior to handover. During this stage, your builder can really play hardball with you. During ours, he was like down right - NO, it doesnt need to be fixed! And we were like, NO, this is unacceptable because it's our investment, we want this fixed! Period. And then the independent inspector goes, "if it were my house, I'd want that fixed" LMAO!

2. Visit the house regulary and keep a spreadsheet of items that need attention. During building stage, there is a fair bit of staff turnover. We had 4 site supervisors, and plenty of admin people too. Easiest way to keep everyone updated is to put everything on spreadsheet cos there's so much to remember at times. Plus, it helps if people are ticking off items from you list so you can be rest assured.

Visiting the house was satisfying and very exciting :) By going to the house often you can see the progress being made and question things you may think is in the wrong place. This will happen. It happened to us during the pipeworks (cos it's only guest-a-mates until the concrete was laid). Pipe was in the hallway instead of the kitchen; the meterbox was in the middle of the window instead of being to the left of it. etc etc. Plus, you learn so much by questioning how things are done. 

You may become a total whiner. This is ok. This is your house and you're paying someone MEGA-BUX to get it right...not just a few dollars...MEGA BUX!

Oh plus, you get to see what left over material can be savaged i.e. bricks, roof tiles, measuring tapes, lol. We put all our bricks and tiles at the back of the house. They came in handy during fixing stage.

3. Meet face to face with your site supervisor. It will give you peace and mind and be on top of the game. You'll also get to know what the next stage will look like or if they've had any stuff-ups/delays etc. We were in a state of frustration because no one kept us in the loop and with being people fired so often, we  tried to arrange weekly - fornightly meetings with our SS - which he was kind enough to do. We met him at 7am before work which worked for us. Most tradies start work at 6am - oh my, soooo freezzzing in the winter!! Oh, he also suggested a good time for our "own cable person" to come in on the weekend so he can do his thing. *get the drift?*

4 . You have the right to ask for compensation if things don' go right. Maybe throw in a little something-something to appease the new house dwellers. (maybe a free drive way, patio, decking, air-con????)

5. Before even signing any contract or going to any colour appointments: negotiate!! I cannot stress this enough~ 

Give the impression you are serious and want to build. Provide the "I would love to build with you, but XX is offering this better deal. What can you do for me?" You dont get if you dont ask! Every bloody penny counts! It's not like you have to show them proof of any documents - just play bluff.

6. Take pictures.  A lot of pictures. You will not realise it's value until you get home or sometimes 1 week later. You will start to question why things appear in certain places. You will thank yourself because you know where all the studs are (in your wooden frame so you can hang your pretty pictures later on). You can show them to your friends and ask for expert advice too knowing you have the pics in hand.

7. Save, save and save some more money for the move in date!
I've got to live with newspapers instead of pretty curtains for the first few months. I've also got to invest in some nice new furniture, linen, pots, TV, theater system. Most importantly my wedding.

8. Take your time and soak it all in.

Although we took 6 months before we had signed the contract, this period allowed us to do plenty of research and helped us to confirm exactly what we wanted. I'm happy that we took our time with this process because the overall journey has been quite smooth. There were really no hiccups expect for two things which were out of our control (neighbours garage gutter over handing and retaining wall (with the other neighbour) cos their land was slightly raised). Our ss was able to resolve all items and all setbacks and delays.

Hang in there Stage - Fixing Stage
This stage is a drainer - it feels like months and months go by and nothing is being done.

During the tail end of the journey, there were heaps of opportunities Henley provided to us to settle and hand over they keys. Although it was quite tempting to just say, "give us the god damn keys", you have to step back and look at the bigger picture.

For example, Henley asked us during the Presentation Stage whether we wanted to settle on the exact same day and provide our nice cheque to them.

On this day we had an independent inspector who picked up so many things that cant be picked up by the normal person (unless ur a tradie and you do this kind stuff every day). Imagine we had picked up the keys then? The storm drainage wasnt even complete, windows were chipped, paint marks appeared everywhere, doors were worpt (like bent a little), there were missing screw drivers. The person presenting the house was like "dont worry, Ive checked everything. Ive checked all the insulation and all the electrical points ". Sorry mate, unless you've checked it yourself, you shouldn't be satisfied. I mean, we found that our whole garage wasnt insultated and that two light points werent working. Chris always used the excuse, "I have to report back to the Mrs, so dont blame me if I want to be thorough".

I guess, if we moved in during that those opportunities, I believe (very strongly) that we would be chasing our builder for 6 months to get these minor defects completed. Better wait 2 weeks to get it all sorted, than chasing them 6-12 months down the road (and you would be their least of priorities by then!). I guess good things come to those who wait...patiently (very patiently).

During Presentation Stage
You gotta go into the presentation process pretty prepared otherwise they'll bluff their way ( I mean they are sales people, they want your money; they want to close the deal,  they want your house done and dusted and off their books too). Whether a third person is with you or best thing - go and check the house out for yourself so you're well equipped with ammo to negotiate what should and shouldnt be fixed etc.

9. Go on a nice holiday/break.

You deserve a break after all that!












tailoring the house to suit us - Part 3


Thought I;d take the time to update this in more detail as I remember more and more of extra upgrades we had.


When we got into the researching stage and finding out what we really wanted for our house, we found it took us 6 months to get the full and finial list before signing the tender documents.
In summary here are the items we added/modified to OUR place:
A. Added an Extra Garage
B. Added the Butler’s Pantry
C. Added the Grand Alfresco
D. Added sound proofing to the laundry and theatre 
E. Added 600 mm eaves (CANT believe that arn’t standard!!!)
F. Added double doors to the study
G. Added a whole wall of cupboards/storage space to the laundry
H. Added overhead cabinets in the landry
I. Included brick infill above garage
J. Added Solar panels
K. Upgraded to premium  bricks
L. Added the fireplace pipe (inside the current wall cavity so we can do this ourselves later)
M. Upgraded floor titles (to porcelain)
N. Upgraded to spa to ensuite
O. Added overhead pantry space over the fridge
P. Upgraded to 2 front french doors
Q Wooded windows to ensuite (gotta double check that one)
R. Added extra gas pipe in alfresco (for our BBQ parties), heaps of extra double power points, got extra switches (to turn on lights from different ports)

S. Added the bi-fold doors (to grand alfresco)
T. Added extra insulation over the garage space (had to do this to get our sustainability rating)
U: Upgraded to rain shower tap in en-suite.
V: Added double rail (towel) handle in shared bathroom.


During the build, here are things that were unexpected (no cost - part of site costs):
I: Retaining Wall
II: The garage being moved in (ever so slightly) cos the neighbours gutters overhung by an inch 

Render

So finally got the render business sorted.

The small little colour section above the window was painted a dark olive colour. This was not in the original plans. The builder just decided to paint it that colour so "it wouldn't get dirty" afterwards. Sorry Mr, but that's not what was in the contract and was agreed on.


So now its now a yellow/beige colour and the facade looks better now.



Ching Ching!! We got the keys!


We've finally got the master keys!

It's been so long now...

We actually didnt think we going to have the keys in our hands today because we visited the house last night and a few minor things weren't completed (by none other than the plumber). But he managed to show up this morning at 7am to get the job done. All documents have been signed off and apparently we have so many sets of keys - what are we going to do with them all?

Now bit by bit, we'll migrate all boxes of presents out from under our beds and into our new house.

Tahhh-dahh!




Tuesday 22 May 2012

Soldiering on

Yes, we're powering on now. Only a couple of more days left until they do a take two on presentation of house.

Hopefully there will be no further fixes to the house required.

Fingers crossed we have the keys by Monday!!!!!!!!

Sunday 6 May 2012

We're still waiting

Last week marked the 3rd week since we had presentation day with Henley.

We were anticipating that all items on the 4 page list of things to fix would be attended to by now, but sadly it's not. We went past the block today and there are heaps of little things that needs to be done:  a little paint here and there, replacement of scratched windows etc. It's taking f.o.r.e.v.e.r.......



Just because he is cool

He gets a special mention because he is so cool with that Suzuki RE-5 Rotary motorbike!



Tying the knot

We're tying the knot this year on
12.12.2012
Twenty Twelve


A lot to organise from now. 

Wednesday 25 April 2012

come on and hurry up

They are taking their time with the fixing stage....

The hand over day is just inches away from reach....

Commmeeee onnnnnn, already!

NB: I guess the rainy weather isnt doing anyone any favours. The tradies cant fix anything external because of the rain.  

Monday 23 April 2012

pictures of house so far - internals







pictures of house so far - external








pictures of house so far - the facade





Our own pre-inspection

So prior to our "Presentation Day" we did our own little pre-inspection. A little birdie left the key in the keyhole that allowed us to enter the house.

We found so many red stickers, marking things that needed fixing.

It was red dot galore, and here are some pictures to prove it.


A strip of paint wasnt applied properly here.



They forgot to plaster and smooth here.


They forgot a little screw here.


A bit of pain drab there.



The render is starting to show breakout and small dots are appearing darker...


Uneven surface.


And other minor defects here and there.